Job DescriptionJob Description
Electrician: All experience levels
Electrician Pay: $20/hr. - $35/hr.
We are currently hiring Electricians with any amount of experience in performing electrical installations at a data center build out. Candidates are encouraged to apply ASAP as we have an immediate need in the Ashburn, VA area.
Please apply today by calling/texting 703-636-0758 or emailing your resume to mattm@outsource.net or apply directly to this posting by clicking “Apply” below.
Job Duties:
· Installing, bending, and removing conduit
· Installing and replacing lighting fixtures/systems, and with electrical panels, transformers, switches, motors, etc.
· Pulling electrical wiring through electrical conduit
· Terminating electrical panels, set fixtures, outlets, and various electrical devices
· Installing and connecting wires to circuit breakers, transformers, outlets, or other components and systems
Electrician Requirements:
· Recent experience performing electrical installations in a commercial setting
· Your own tools and PPE (safety gear)
· Must be familiar with updated NEC codes
· Experience reading and interpreting blueprints
Compensation:
· Pay Range: $20/hr. - $35/hr.
· Get paid weekly!
· Referral Bonuses of up to $250 for referrals that result in a placement – simply click “REFER” below to share with a friend!
Company DescriptionOutsource is the Nation's leading provider of low voltage and electrical talent. We work EXCLUSIVELY in electrical and low-voltage, and have been placing candidates of all levels with the right companies since 1998 so we know a thing or two about making a good match.
Outsource is an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to , , , , or expression, , , marital status, , , veteran status, genetic information, or any other protected status.Company DescriptionOutsource is the Nation's leading provider of low voltage and electrical talent. We work EXCLUSIVELY in electrical and low-voltage, and have been placing candidates of all levels with the right companies since 1998 so we know a thing or two about making a good match. \r\n\r\nOutsource is an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to , , , , or expression, , , marital status, , , veteran status, genetic information, or any other protected status.