Job DescriptionJob Description
Commissioning Engineer – Consultant
About CBC
Canadian Breaks Consulting, LLC is a growing consulting firm based in Amarillo, TX serving clients with customized project management solutions to complex problems on critical projects.
Our Mission: "To plan, manage, and execute projects with hearts, hands, and feet of Christ."
Our Core Values
Integrity: A commitment to Truth with a consistent and uncompromising adherence to strong moral and ethical principles and values.
Excellence: A constant and consistent drive to uphold and raise standards in whatever you do.
Prudence: A commitment to taking the extra step and considering the reasonableness of your actions as well as their consequences.
Stewardship: An unwavering willingness to carefully and responsibly manage interests separate from and greater than your own.
About the Role
Introduction
The Commissioning Engineer supports onsite commissioning quality control by assisting contractors with startup preparation, executing checklists and functional testing, and closing the documentation that allows a system to be turned over. This position is fully onsite at the project in Childress, TX.
Years of Experience
3+ years of relevant experience in commissioning, startup, or field engineering
Qualifications
Required
- 3+ years of commissioning, startup, or field engineering experience on industrial, high-tech, semiconductor, or mission-critical projects.
- Ability to read and interpret construction documents, specifications, control sequences, and technical manuals, and to verify installed work against them.
- Able to work fully onsite in Childress, TX, access all areas and levels of an active construction site, pass a pre-employment drug and alcohol screen, and work in the United States without sponsorship.
- Thorough understanding of all aspects of commissioning, from pre-functional checklists through functional performance testing and turnover.
- Familiarity with medium- and low-voltage distribution, large generators, UPS equipment, and electrical installations on large mechanical and process equipment.
- Hands-on BMS, EPMS, or I&C verification and functional testing experience.
- Hands-on experience supporting integrated systems testing and load bank testing.
- Data center or other mission-critical MEP startup exposure.
- Experience with commissioning management software such as Latista or equivalent.
- OSHA 30 certification and current