Skip to main content

Infrastructure & Capital Projects - Data Center Construction Project Engineer III, ANS

Job DescriptionJob DescriptionOpening from Default - All locations You’ve Never Been Satisfied with "Good Enough." You want to make an impact, not just manage projects, but change how the world gets built. At Accenture Infrastructure & Capital Projects, you’ll do exactly that. You’ll help develop and deliver the factories, grids, transit systems, and public infrastructure that keep communities moving - and do it smarter, safer, and more sustainably than ever before. You’ll work alongside people who think big and act bold - project managers, engineers, technologists, and strategists who blend real-world experience with digital innovation and AI. Together, we’re transforming how capital projects are planned, managed, and executed, creating a better way to build for the future. Because “good enough” builds the past. You’re here to build what’s next, on a team that outperforms every norm. Visit us here to learn more about ​Accenture Infrastructure & Capital ProjectsAs Accenture continues to grow, you may see a variety of new career opportunities, and depending on the role and location you may be directed to apply through Accenture Infrastructure and Capital Projects LLP or one of our other legal entities - Accenture Infrastructure and Capital Projects, LLC or Accenture Infrastructure and Capital Projects Inc., with benefits varying by country and role, so please check with your recruiter for details.THE WORK:

  • You’ll study time, motion, methods, and speed involved in maintenance, production, and other operations to establish standard production rate and improve efficiency.

  • You’ll interpret engineering drawings, schematic diagrams, or formulas and confer with management or engineering staff to determine quality and reliability standards.

  • You’ll read worker logs, product processing sheets, and specification sheets to verify that records adhere to quality assurance specifications.

  • You’ll aid in planning work assignments in accordance with worker performance, machine capacity, production schedules, and anticipated delays.

  • You’ll prepare charts, graphs, and diagrams to illustrate workflow, routing, floor layouts, material handling, and machine utilization.

  • You’ll observe workers using equipment to verify that equipment is being operated and maintained according to quality assurance standards.

  • You’ll observe workers operating equipment or performing tasks to determine time involved and fatigue rate using timing devices.

  • You’ll evaluate data and write reports to validate or indicate deviations from existing standards.

HERE'S WHAT YOU'LL NEED:• Bachelor's degree in engineering required.
• 10+ years experience required.BONUS POINTS IF YOU HAVE:

  • Creativity, verbal and written communication skills, analytical and problem solving ability.
  • Team player and detail oriented.
  • Ability to make sketches, engineering drawings and common computations.
  • Ability to read and interpret blueprints, technical drawing, schematics and computer-generated reports.
  • Previous experience with computer applications and software related to engineering field, such as Computer Aided Design (CAD).

Compensation at Accenture varies depending on a wide array of factors, which may include but are not limited to the specific office location, role, skill set, and level of experience. As required by local law, Accenture provides a reasonable range of compensation for roles that may be hired in Illinois, Minnesota, California, Colorado, District of Columbia, Maryland, Massachusetts, New Jersey, New York, Ohio, or Washington as set forth below. We accept applications on an on-going basis and there is no fixed deadline to apply.Closing from Default - All locations We believe that no one should be discriminated against because of their . All employment decisions shall be made without regard to , , creed, color, , , , ancestry, status, veteran status, , gender or expression, genetic information, marital status, citizenship status or any other basis as protected by federal, state, or local law. Our rich makes us more innovative, more competitive, and more creative, which helps us better serve our clients and our communities. For details, view a copy of the Accenture Equal Opportunity and Affirmative Action Policy StatementAccenture is an EEO and Affirmative Action Employer of /Minorities/Veterans/Individuals with Disabilities. Accenture is committed to providing veteran employment opportunities to our service men and women.