Job DescriptionJob Description
MEP, QA, & Commissioning Professionals Needed – Data Center Construction
Employment Type: Full-Time
Industry: Data Center Construction / Mission-Critical Facilities
Overview:
We are seeking detail-oriented and disciplined MEP QA & Commissioning Professionals to support the quality assurance and commissioning efforts for a large-scale data center construction projects. These positions play a critical role in ensuring mechanical, electrical, and plumbing systems are installed, tested, and turned over in full compliance with design intent, project standards, and reliability requirements.
The ideal candidate has hands-on field experience with MEP systems, familiarity with commissioning processes, and a strong understanding of quality documentation, testing procedures, and system turnover requirements in mission-critical environments.
Key Responsibilities:
Quality Assurance & Documentation:
- Perform field inspections of mechanical, electrical, and plumbing installations to verify compliance with project drawings, specifications, and applicable codes (NEC, NFPA, ASME, etc.).
- Track and document QA/QC progress through inspection checklists, redlines, and punch list items.
- Support the review and validation of system installation records, test documentation, and vendor certifications.
- Participate in quality audits and ensure all deviations or deficiencies are properly recorded and resolved before system acceptance.
Commissioning Support:
- Assist in the execution of commissioning activities for MEP systems, including pre-functional checks, functional testing, and integrated systems testing.
- Support the commissioning team by preparing and maintaining test scripts, commissioning documentation, and field data collection tools.
- Verify equipment startup and system performance in alignment with commissioning procedures and acceptance criteria.
- Participate in commissioning meetings, coordinate test readiness with contractors, and help manage the resolution of commissioning issues.
System Turnover & Closeout:
- Assist in the preparation and organization of system turnover packages, including as-built documentation, test results, O&M manuals, and training materials.
- Support validation of all required documentation prior to final client handover.
- Ensure that all QA/commissioning deliverables are properly tracked, logged, and submitted in accordance with project turnover schedules.
Safety & Compliance:
- Adhere to all site-specific safety policies and procedures.
- Promote and support a culture of safety, quality, and accountability on the jobsite.
Qualifications:
- High school diploma or equivalent required; technical certification or associate degree in mechanical, electrical, or construction disciplines .
- At least 3–5 years of experience in MEP fieldwork, quality assurance, or commissioning within data centers, industrial, or mission-critical environments.
- Working knowledge of mechanical and electrical systems such as chilled water, CRAC/CRAH units, generators, UPS systems, switchgear, and power distribution.
- Familiarity with commissioning standards and guidelines (ASHRAE, NEBB, or similar).
- Experience using QA/commissioning software tools (e.g., Procore, BIM 360, CxAlloy, or custom databases).
- Strong organizational and communication skills, with attention to detail and documentation accuracy.
- Ability to interpret MEP drawings, P&IDs, and control diagrams.
- Comfortable working on active construction sites; must be able to lift, bend, climb, and access mechanical/electrical spaces as needed.
Company DescriptionAM Technical Solutions (AM), founded in 1994, is a proven and licensed architect, engineering, and construction firm. Our company delivers the entire scope of work for high-tech construction projects on schedule, on budget, and at the level of quality required by customers.
The AM core foundation was built on quality programs that optimized semiconductor facility operations. As the company developed, AM added core competencies on pre-construction, procurement, and construction. Further, through strategic acquisitions, we added design, commissioning, and validation to create a complete end-to-end solution for high-tech construction project delivery.
AMTS AE is a licensed Engineering and Architecture, Business Unit of AM Technical Solutions. At AMTS AE, we focus on providing design and consulting services for advanced technology, government, university, and industrial clients, specializing in research, pilot lines, manufacturing, cleanrooms, and advanced laboratories. We also provide start-up consulting, process improvements, industrial engineering, and high-tech operations support.
For more information, please visit www.amts.comCompany DescriptionAM Technical Solutions (AM), founded in 1994, is a proven and licensed architect, engineering, and construction firm. Our company delivers the entire scope of work for high-tech construction projects on schedule, on budget, and at the level of quality required by customers.\r\n\r\nThe AM core foundation was built on quality programs that optimized semiconductor facility operations. As the company developed, AM added core competencies on pre-construction, procurement, and construction. Further, through strategic acquisitions, we added design, commissioning, and validation to create a complete end-to-end solution for high-tech construction project delivery.\r\n\r\nAMTS AE is a licensed Engineering and Architecture, Business Unit of AM Technical Solutions. At AMTS AE, we focus on providing design and consulting services for advanced technology, government, university, and industrial clients, specializing in research, pilot lines, manufacturing, cleanrooms, and advanced laboratories. We also provide start-up consulting, process improvements, industrial engineering, and high-tech operations support. \r\n\r\nFor more information, please visit www.amts.com