Job Description
Futura is partnering with a data-center–focused infrastructure platform to hire a technical Project Manager / Development Engineer to support the delivery of utility-scale energy projects.
This role sits at the center of development, engineering, and construction handoff, owning technical execution while commercial and finance teams focus on dealmaking. It is a hands-on technical leadership role with real decision-making authority — not a PMO seat and not a pure design engineering role.
Projects include utility-scale BESS and solar (often 100MW+), with direct exposure to hyperscale data-center power strategy and adjacent infrastructure.
Key Responsibilities
Development & Pre-Construction
- Review projects during acquisition and development
- Evaluate site layouts, acreage requirements, and GCR assumptions
- Assess equipment selection and high-level technical specifications
- Validate interconnection and transmission assumptions
- Provide clear technical “go / no-go” input before capital is committed
Engineering & EPC Interface
- Serve as the primary technical point of contact with EPCs
- Lead equipment selection, scope clarification, and technical redlines
- Review designs and resolve technical issues
- Own technical exhibits during EPC contract negotiations
Consultant & Discipline Management
- Coordinate and review external consultants across:
- HV / MV engineering
- SCADA
- Interconnection
- Ensure work products are technically sound and internally consistent
- Identify flawed assumptions, hidden risks, or unrealistic performance inputs
- Example: validating BESS degradation profiles
Portfolio Support
- Support ~1–1.5 active projects at a time across development and construction
- Typical time allocation:
- ~80% active projects
- ~10% pipeline development
- ~10% acquisition and diligence support
Background & Experience
We are flexible on title and background. The common thread is strong technical judgment and comfort operating in an evolving environment.
Example backgrounds include:
- Development Engineers (2–3 years in development ideal)
- EPC engineers moving into project ownership
- Interconnection or grid specialists
- SCADA-focused engineers
- BESS OEM application or sales engineers