Job Description
Job description - Senior Liquid Cooling Commissioning Technician
We are currently supporting one of our long-standing clients on their growth journey and are hiring for a Senior Liquid Cooling Commissioning Technician based in Colorado City, Texas.
Role purpose
Lead the rack liquid-cooling QA execution for one active loading-bay liquid-test lane. This role owns safe operation of the QA cart, pressure/vacuum/fill/bleed/recirculation sequence and technical decision-making during abnormalities.
Core responsibilities
- Own execution of R-LCAT for assigned lane from test-cart pre-check through release decision recommendation.
- Confirm test-cart readiness, filter condition, relief-valve setting, instrumentation status and coolant batch suitability.
- Control valve sequencing, pump start/stop, pressure ramp, vacuum isolation, low-flow fill, air purge, recirculation and drain/preservation sequence.
- Interpret pressure decay, vacuum rise, differential pressure, flow stability, persistent air, filter loading and coolant-quality trends.
- Initiate stop-work for leaks, abnormal pressure behavior, unsafe coupling state, incorrect polarity, persistent air or suspected contamination.
- Approve re-test only when a credible temporary test-setup issue has been corrected.
- Provide technical disposition recommendation: pass, re-test, quarantine, or customer/OEM escalation.
Required technical skills and experience
- Hydronic loop commissioning, pressure testing, pump and valve sequencing, air purge and differential-pressure interpretation.
- Working understanding of secondary technology cooling loops, rack manifolds, direct-to-chip cooling, dry-break connectors and high-flow trunk couplings.
- Ability to read MOPs, P&IDs, simplified loop diagrams, rack interface drawings and test-cart schematics.
- Understanding of coolant cleanliness, conductivity/pH relevance, particle risk and contamination controls.
- Strong pressure-safety discipline and ability to work around high-value pre-integrated IT equipment without disturbing cabling.
Recommended certifications / training
- CompTIA Server+ or equivalent data-center hardware awareness .
- Mechanical pressure testing / hydronic commissioning training strongly .
- OEM or customer liquid-cooling training mandatory before production work.
- Site EHS training, spill response training and pressure-test safety training mandatory.
- LOTO awareness where applicable, even though racks are not powered during loading-bay R-LCAT.
Tools and systems normally used
- Portable liquid-cooling QA cart / mini-CDU simulator.
- Pressure transducers, mechanical gauges, vacuum pump, micron gauge and relief valves.
- Flow meters, differential-pressure sensors, pH/conductivity/temperature meters and particle/sample tools.
- Approved valve keys, clean caps/plugs, hose supports and controlled drain/preservation equipment.
- Digital QA record system for test sequence and evidence review.
Expected deliverables
- Completed test sequence record and technical interpretation notes.
- Pressure/vacuum/flow trend acceptance recommendation.
- Stop-work and abnormality records where applicable.
- Technical sign-off input for rack release or quarantine.
Explicit exclusions / escalation boundary
- Does not move racks with MHE; rack movement is customer/DC owner responsibility.
- Does not modify proprietary rack internals, replace blind-mate assemblies or open server trays unless specifically authorized by customer/OEM MOP.
- Does not change production CDU settings or connect to the facility primary loop.
- Does not waive acceptance criteria without formal customer/OEM deviation approval.