Skip to main content

Cleanroom Construction Scheduler

Job DescriptionJob Description

Cleanroom Construction Scheduler

Department: Cleanroom Construction/MEP

Location: Boise, Idaho

Duration: 1-year Contract-to-Hire

Work Model: On-site

Number of Openings: 2

**Per diem included!

Owner's Representative - Scheduler

Job Description

Seeking an experienced Construction Scheduler to serve as Owner's Representative for semiconductor fabrication facility construction projects in Boise, Idaho. This critical role requires expertise in complex capital project scheduling, critical path analysis, and semiconductor facility construction sequencing. The Scheduler will develop, maintain, and analyze comprehensive project schedules that coordinate cleanroom construction, MEP installation, process tool integration, and production ramp activities across multi-billion-dollar facility expansions.

Primary Responsibilities

As Owner's Representative Scheduler, you will create and maintain integrated master schedules for semiconductor fabrication facility construction projects using Primavera P6. Your schedules will serve as the foundation for project decision-making, resource allocation, and executive reporting across projects ranging from $50M cleanroom buildouts to $15B+ fabrication expansions.

Develop detailed construction schedules encompassing all project phases including design, procurement, site preparation, structural construction, architectural finishes, cleanroom installation, MEP systems, process utilities, tool installation, commissioning, qualification, and production ramp. Establish logical relationships and constraints between activities, define critical and near-critical paths, and identify schedule risks and opportunities.

Coordinate schedule development with multiple general contractors, trade contractors, equipment vendors, and internal company teams including Facilities, Manufacturing, Process Engineering, and Quality. Integrate contractor baseline schedules into master project schedules, ensuring alignment with our overall facility delivery strategy and semiconductor tool installation timelines.

Conduct schedule analysis including critical path identification, float analysis, what-if scenarios, schedule compression opportunities, and resource leveling. Perform variance analysis comparing baseline to actual progress, identifying slippage causes and developing recovery plans. Generate lookahead schedules at various intervals (2-week, 6-week, 90-day) to support field coordination and resource planning.

Lead weekly and monthly schedule review meetings with contractors and project teams. Evaluate contractor schedule updates for logic, completeness, and accuracy. Analyze schedule impacts from design changes, RFIs, change orders, and unforeseen conditions. Review and validate time extension requests and acceleration proposals from contractors.

Required Qualifications

-Bachelor's degree in Construction Management, Engineering, or related field

-Minimum 5-10 years of construction scheduling experience with at least 5 years on complex capital projects over $50M

-Expert-level proficiency in Primavera P6 (P6 EPPM or P6 Professional)

-Strong understanding of critical path method (CPM) scheduling principles and techniques

-Experience with semiconductors, pharmaceutical, data center, or other mission-critical facility construction

-Knowledge of construction means and methods across all major trades

-Ability to read and interpret architectural, structural, and MEP drawings

Qualifications

-Professional certifications: PSP (Planning and Scheduling Professional), PMP, or equivalent

-Experience scheduling cleanroom construction and ISO-classified environments

-Familiarity with design-build, CMAR, or EPC project delivery methods

-Knowledge of semiconductor manufacturing processes and tool installation sequences

-Experience with schedule delay analysis methodologies (TIA, Windows, Collapsed As-Built)

-Proficiency in additional scheduling tools: Microsoft Project, TILOS, Asta Powerproject

Construction Scheduler | Primavera P6 (Expert Level) | P6 EPPM | CPM (Critical Path Method) | Owner's Representative | Semiconductor Tool Installation Sequencing | Integrated Master Schedule (IMS) | Earned Value Management (EVM) | Schedule Delay Analysis (TIA) | High-Purity Process Utilities | Cleanroom Pressurization Cascades | 4D/5D Modeling (Synchro/Navisworks)