Job DescriptionJob Description
CSA Cleanroom Senior Project Manager - Project Controls
Department: Cleanroom Construction/MEP
Location: Boise, Idaho
Duration: 1-year Contract-to-Hire
Work Model: On-site
Number of Openings: 2
Job Description
We are seeking an experienced CSA (Cleanroom, Shell, and Administrative) Cleanroom Senior Project Manager to serve as Owner's Representative for semiconductor fabrication facility construction projects in Boise, Idaho. This senior-level position requires comprehensive expertise in cleanroom construction delivery, project controls, and semiconductor manufacturing facility requirements. The PM/PC (Project Manager/Project Controls) will lead complex, multi-million-dollar cleanroom buildouts from design through commissioning.
This is a high-visibility position reporting to senior construction leadership with direct impact on our company's manufacturing capacity expansion. You will work on cutting-edge fabrication facilities that produce DRAM and NAND flash memory products powering everything from smartphones to data centers.
Primary Responsibilities
As the Senior Project Manager, you will serve as the primary representative for all CSA cleanroom construction activities, providing strategic oversight and tactical execution of fabrication facility projects.
You will manage the complete project lifecycle including planning, design coordination, procurement, construction execution, commissioning, and handover to operations.
Lead cross-functional project teams including architects, engineers, general contractors, specialty cleanroom contractors, and internal company stakeholders.
Develop and maintain comprehensive project schedules using Primavera P6 or similar tools, ensuring critical path activities align with semiconductor tool installation and production ramp timelines.
Oversee project budgets ranging from $50M to $500M+, implementing cost controls, tracking expenditures, forecasting variances, and managing change orders.
Direct cleanroom construction activities include raised access floors, ceiling grid systems, wall panel installation (hardwall/softwall), lighting systems, HVAC supply/return plenums, and process support infrastructure.
Ensure all work complies with ISO 14644 cleanroom standards, SEMI specifications, and Micron's facility standards.
Coordinate integration between CSA scope and MEP/process tool installation teams to maintain schedule alignment and minimize conflicts.
Manage design reviews and constructability analyses, providing owner input on architectural and engineering deliverables.
Review and approve contractor submittals, RFIs, and deviation requests with focus on cleanroom performance, contamination control, and operational requirements.
Lead risk identification and mitigation planning, develop recovery strategies for schedule impacts, and escalate critical issues to executive leadership.
Project Controls Responsibilities
Establish and maintain project controls framework including cost management systems, schedule baseline development, progress tracking metrics, and earned value analysis.
Generate executive-level reporting on project health including schedule performance indices, cost performance indices, forecast at completion, and risk registers.
Conduct regular progress meetings with contractors and internal teams, tracking action items and deliverables.
Implement quality assurance/quality control protocols specific to cleanroom construction including particle count verification, air flow testing, pressure differential validation, and surface cleanliness inspection.
Coordinate FAT (Factory Acceptance Testing) and SAT (Site Acceptance Testing) for cleanroom systems prior to tool installation.
Required Qualifications
Bachelor's degree in Construction Management, Engineering, Architecture, or related field
Minimum 10-12 years of construction project management experience with at least 7 years in cleanroom or semiconductor facility construction
Demonstrated succe