Job DescriptionJob Description
Data Center Technician I, II and III - $25-35/hr - DOE
We are currently hiring Data Center Technicians (Level I) with 1+ years of experience performing low voltage installation a data center environment. Candidates are encouraged to apply ASAP as we have an immediate need in the Manassas/Gainesville area. Qualified candidates will send an updated resume for consideration. Interviews are currently underway. Candidates MUST have data center cabling/construction experience to be considered-networking or IT experience does not qualify you for this role.
Please apply today by calling/texting Emily Bymers at 703-344-9626 or emailing your resume to emily@outsource.net or apply directly to this posting by clicking “Apply” below.
Data Center Technician Duties:
- Pulling and routing CAT 5 or CAT 6 or Fiber cable in new construction and existing data center environment
- Dressing, labeling, and terminating low voltage wires
- Installing support structures (ladder racks, racks, switches, servers, j-hooks, cable trays, basket trays, etc.)
- Terminating voice and data jacks and dressing and terminating distribution frames (66 or 110 blocks, patch panels)
- Rack and stack work, closet work, putting together server racks, patch panels
Qualifications:
- Recent experience installing low voltage cable in new construction or data center environment is required
- Familiarity with BICSI, EIA, TIA, or NEC Standards
- Experience running or bending conduit, with digital multi-meters, and testing cable is a plus
- Fiber experience including Anaerobic Terminations, SC and LC Connectors, and Splicing is a plus
- Ability to read and understand schematic and line diagrams
- Your own basic telecom tools including punch downs, snips, wire strippers, cordless drill, PPE (safety gear), etc.
Compensation:
- Competitive starting pay $25 -$35/hr or depending on experience
- Get paid weekly!
- Option to enroll in Medical, Dental, Vision, and contribute to 401K
- Referral Bonuses of up to $250 for referrals that result in a placement – simply click “REFER” below to share with a friend!
Company DescriptionOutsource is the Nation's leading provider of low voltage and electrical talent. We work EXCLUSIVELY in electrical and low-voltage, and have been placing candidates of all levels with the right companies since 1998 so we know a thing or two about making a good match.
Outsource is an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to , , gender, , gender or expression, , , marital status, , , veteran status, genetic information, or any other protected status.Company DescriptionOutsource is the Nation's leading provider of low voltage and electrical talent. We work EXCLUSIVELY in electrical and low-voltage, and have been placing candidates of all levels with the right companies since 1998 so we know a thing or two about making a good match. \r\n\r\nOutsource is an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to , , gender, , gender or expression, , , marital status, , , veteran status, genetic information, or any other protected status.